The initial data obtained as a result of the calculation, necessary for constructing the cyclogram, can be entered into the network model. The compiled network model serves for operational planning, management and control over the progress of construction, the implementation of the leading process for the installation of structures and equipment, and other purposes. In construction, to protect your eyes, you may need safety glasses, which can be purchased inexpensively here: goggles.
The main provisions of the design of the organization of the construction site for the period of combined installation. The consolidated general plan of the construction site (construction plan) for the period of the combined installation of buildings and equipment structures must be developed in accordance with the “Instruction on the procedure for compiling and approving projects for the organization of construction and projects of work” (SI 47-67) and departmental regulatory documents of the Ministry of Monet-Tazhaspetsstroy of the USSR on the design of the production of installation and special construction work. In the preparatory period of construction, when designing the organization of the construction site, the main issues of the construction technology with the linking of all technological solutions for the implementation of the main works should be worked out.
The solutions of the construction plan should be determined by the following basic factors:
1) the nature of the construction area and the availability of sites suitable for pre-assembly of equipment and pipelines, storage of structures, materials and equipment;
2) the presence of permanent and temporary roads in the construction area;
3) the presence of permanent and temporary networks of electricity and water supply;
4) types and placement of mounting machines and mechanisms for vertical and horizontal transport and vehicles;
5) organization and technology of installation of building structures, process equipment and pipelines.
Basic design provisions